Roll over image to zoom in
- Direct Joules readout on front panel after Energy Reduction Test.
- Increased accuracy in accordance with IEC 60601-2-25 and -2-27:2011 requirements.
- 20 second period between pulse delivery
- Increased signal generator voltage for -2-27 tests (Order Option SG).
- Integrated Pass/Fail reference for checking the equipment and test setup.
- Dry Capacitor delivers >,2.5M pulses at 20 second intervals.
- Integrated energy measurement, see demonstration video.
- USB Testminder, Computer Control.
- External interlock, disables HV output and defeats test when circuit is open.
- Ergonomically designed for safety, speed and efficiency.
- Front panel indicates polarity
- Output voltage and polarity are controlled manually on front panel or via TestLink.
- Cables, manual and calibration certificate included.
- One year calibration cycle.
- One year warranty.
Additional information
Brand | West Compliance |
---|